Project Summaries
While the section entitled
Case Studies gives some detailed examples of recent work undertaken
for our clients, this section gives a number of bullet point summaries
of more projects to illustrate the breadth of our activities and
the scope of our skills and experience.
Assignment
K101
Sector
|
Retailing
|
Product
Type(s) |
Convenience
Stores |
Project
Type |
Logistics
Strategy Review |
Scale
of Business |
£1bn.
sales; 1,500 stores |
|
|
Key
Task 1 |
Review
current logistics strategy and identify strengths and weaknesses
|
Key
Task 2 |
Review
warehousing operations and inventory planning to determine
whether fit for purpose |
Key
Task 3 |
Analyse
transport operations for cost and service efficiency |
Key
Task 4 |
Develop
alternative operating strategy to maximize network performance
at least cost |
| Results
|
Reversed
existing strategy to protect peak sales and profitability
targets; New strategy saves £1.8m and avoids £2m
capital spend
|
Assignment
K102
Sector
|
Retailing
and Wholesaling |
Product
Type(s) |
Discount
Food and General Merchandise |
Project
Type |
Logistics
Strategy Review and Implementation |
Scale
of Business |
£170m
sales; 28 stores; 200k sq.ft. CDC |
|
|
Key
Task 1 |
Review
existing logistics strategy and identify strengths and weaknesses
|
Key
Task 2 |
Establish
warehousing and transport development plan including major
refurbishment programme for the central warehouse including
updated WMS |
Key
Task 3 |
Analyse
inventory and advise on business implications |
Key
Task 4 |
Developed
and Project managed the implementation plan for central warehouse
|
| Results
|
Successful
implementation (28% more capacity; 24% higher efficiency);
Kept operation running while relaying the warehouse floor;
Avoided unnecessary capital spend of £2.8m; Specified
the Upgraded WMS |
Assignment
K103
Sector
|
DIY
Manufacturing and Assembly |
Product
Type(s) |
Power
Generators |
Project
Type |
Mergers
and Acquisition Logistics Review |
Scale
of Business |
£30m
sales; 3 Manufacturing sites; Pan-European distribution |
|
|
Key
Task 1 |
Develop
logistics planning and costing model for pan-European distributor
|
Key
Task 2 |
Assess
impact of planned major East European acquisition on network
configuration, costs and service; |
Key
Task 3 |
Develop
alternative pan-European solution with selected 3PLs (including
Tender specification, 3PL selection and evaluation) |
Key
Task 4 |
Identify
role and location of inventory and stocks to service demanding
customer base |
Results
|
Cost
savings of 24% identified; 3PLs selected and evaluated with
an implementation recommendation |
Assignment
K104
Sector
|
Manufacturing
|
Product
Type(s) |
Electrical
Products |
Project
Type |
Northern
European Distribution Centre |
Scale
of Business |
£560m
sales; 7 Manufacturing sites; Pan-European distribution |
|
|
Key
Task 1 |
Analyse
optimum location of a new Northern European Distribution Centre
based on a consideration of labour laws and costs, environmental
legislation; customer service criteria |
Key
Task 2 |
Design
a new 350k Sq. ft. distribution centre to operate at maximum
efficiency |
Results
|
Optimum
Northern European DC location identified and cost-justified;
Design and Build concept for new warehouse which was implemented
|
Assignment K105
Sector
|
Sports
and Leisure |
Product
Type(s) |
Sports
Equipment |
Project
Type |
Logistics
review |
Scale
of Business |
£25m
sales; Internet and retail distribution |
|
|
Key
Task 1 |
Develop
Cost-to-Serve model of existing operations and project impact
of future volumes on supply chain costs |
Key
Task 2 |
Develop
alternative options to reduce customer service lead-times
and delivery costs |
Key
Task 3 |
Establish
a cross-docking and assembly operation to shorten lead-times
|
Key
Task 4 |
Tender
specification; selection of Parcels Carriers; Evaluation of
results; recommendations on implementation |
Results
|
Reduction
is costs by 20%; Delivery lead-times shortened by 48 hours
|
Assignment
K211
Sector
|
Publishing
|
Product
Type(s) |
Newspapers
and Magazines |
Project
Type |
Economics
of Manual Handling |
Scale
of Business |
£400m
sales |
|
|
Key
Task 1 |
Review
economics of wholesale logistics costs for the processing
and distribution of newspapers and magazines |
Key
Task 2 |
Review
local shop handling methods and operating costs to determine
cost of tasks |
Key
Task 3 |
Review
alternative methods of handling and impact of new automated
methods and compare to industry benchmarks |
| Key
Task 4 |
Report
on costs and impact |
| Results
|
The
report found an objective measure and cost of performance
which formed part of the input into the debate about changes
in handling methods in the industry. It contributed to the
change in, and implementation of new, handling methods in
the industry |
Assignment
K212
Sector
|
Wine
Merchant |
Product
Type(s) |
Wines
|
Project
Type |
Business
Process enhancement |
Scale
of Business |
£120m
sales |
|
|
Key
Task 1 |
A
review of current Business Processes throughout the company
|
Key
Task 2 |
A
review of Warehousing and Distribution operating processes
|
Key
Task 3 |
And
to identify and specify system enhancements required to improve
business processes
|
Results
|
Improved
inter-departmental communications, documented processes, warehouse
process manual
|
Assignment
K213
Sector
|
Wholesale
and Franchise Distribution |
Product
Type(s) |
Chilled
Food |
Project
Type |
Middle
East
Logistics Review |
Scale
of Business |
£100m
sales; 50k deliveries; 20k tonnes |
|
|
Key
Task 1 |
Review
efficiency of centralization plans for the Middle East
|
Key
Task 2 |
Review
3PL performance and advise on development
|
Key
Task 3 |
Analyse
inventory levels and develop supply process
|
Key
Task 4 |
Project
management and Sell in of programme to local franchise operations
|
Results
|
Centralisation
project implemented; £1m inventory savings; buy in from
local operators
|
Assignment
K418
Sector
|
Print
|
Product
Type(s) |
In
house Stationary and Display Media |
Project
Type |
Re-Design
warehouse Layouts in existing building. |
Scale
of Business |
£
60m p.a. sales; |
|
|
Key
Task 1 |
Translate
sales growth plans into Logistics requirements. |
Key
Task 2 |
Create
design options for layouts, to tight deadline. |
Key
Task 3 |
Advise
on strategy re other UK sites |
Results
|
Increase
warehouse capacity by 30%
Identify
further potential savings of circa £1.2 m p.a. |
Assignment
K419
Sector
|
Health
Care Supplies |
Product
Type(s) |
Medical
Supplies |
Project
Type |
Reduce
from 8 warehouses to 1 RDC
Define
Layouts & Processes
Validate/amend
Implementation plan. |
Scale
of Business |
Sales
£30m.
Issues
12.7m
Dispatches
78k |
|
|
Key
Task 1 |
Obtain
accurate data on inventory and throughputs from Existing Operations
.
Translate
into meaningful information |
Key
Task 2 |
Advise
on suitability and modifications to warehouse |
Key
Task 3 |
Create
design options for layouts. |
Key
Task 4 |
Align
processes with Red Prairie functionality. |
Results
|
Created
meaningful data set from nothing
Identified
potential failings in building structure.
Produced
Layouts and implementation plans in 1 month. |
Assignment
K420
Sector
|
Telecommunications
|
Product
Type(s) |
Mobile
phones and accessories |
Project
Type |
IT
Supply Chain Systems Strategy and Warehouse Management Systems
(WMS) Review |
Scale
of Business |
£1000m
sales; 1m customers |
|
|
Key
Task 1 |
Map
operational systems architecture and functions
|
Key
Task 2 |
Undertake
Gap analysis between existing IT systems and future requirements
established with management |
Key
Task 3 |
Review
WMS, and develop functional specification. Assist in the management
of the tender process and the evaluation of bids. |
Key
Task 4 |
Assess
priorities and make recommendations on 3 year IT Strategy
for the supply chain |
Results
|
Identified
and costed IT priorities for the Supply Chain. Developed operational
specifications for WMS and identified suitable alternative
supplier |
Assignment
K421
Sector
|
Fashion
Retailing |
Product
Type(s) |
Menswear
and Ladieswear |
Project
Type |
Retail
and Warehouse Management Systems (WMS) Review |
Scale
of Business |
£65m
sales; 40 stores |
|
|
Key
Task 1 |
Develop
functional specifications for full Retail ERP systems requirements
(with an additional sub-set on WMS)
|
Key
Task 2 |
Undertake
Gap analysis between existing IT systems provider and functional
requirements with recommendations on strategy
|
Key
Task 3 |
Develop
tender document and manage tendering process for new Retail
IT systems |
Key
Task 4 |
Help
project manage implementation |
Results
|
New
systems suppliers identified and evaluated; Recommendations
on appointed supplier. Successful assistance with project
management of implementation |
Assignment
K422
Sector
|
Retailing
|
Product
Type(s) |
Clothing
|
Project
Type |
Future
warehousing strategy |
Scale
of Business |
£350m
sales; 70,000 SKUs |
|
|
Key
Task 1 |
Analyse
current operations and determine strengths and weaknesses
|
Key
Task 2 |
Re-design
layouts to improve capacity and performance |
Key
Task 3 |
Develop
future design options for long term warehousing requirements
taking account of development plans and centres of business
gravity |
Key
Task 4 |
Create
new warehouse operational designs to maximize productivity
|
Results
|
Identified
opportunities to improve productivity by 32% and capacity
of existing facilities by 18%; New operations reduce manpower
requirements by 16% and are currently being planned for implementation
|
Assignment
K424
Sector
|
Drinks
industry |
Product
Type(s) |
Wines
|
Project
Type |
WMS
Training Package |
Scale
of Business |
£120m
sales |
|
|
Key
Task 1 |
Review
existing processes and relationship to WMS |
Key
Task 2 |
Prepare
a warehouse systems training package in modular form. Suitable
for: new starters; existing staff as a refresher; existing
staff as an aid to a deeper understanding of the system |
Key
Task 3 |
Train
trainers in use and maintenance of package. |
Key
Task 4 |
Review
process and implementation of package |
Results
|
Written
training document in modular format, includes exercises and
tests for trainees, covers basic functions and common problems
and more advanced work for experienced users.
|
Assignment
K510
Sector
|
Wholesale
Distribution |
Product
Type(s) |
Non-Food
Consumables |
Project
Type |
Network
Configuration and Transport Review |
Scale
of Business |
£120m
sales; 500k deliveries; 50k tonnes |
|
|
Key
Task 1 |
Review
efficiency of transport operations and fleet usage
|
Key
Task 2 |
Determine
best fit locations for regional depots
|
| Key
Task 3 |
Develop
cost planning and KPI model for contract costing |
Key
Task 4 |
Advise
on role of inventory and future depot network configuration
|
| Results |
£2m
inventory savings, £1.5m transport and overhead savings;
business review of inventory |
Assignment
K511
Sector
|
Wholesale
Distribution |
Product
Type(s) |
DIY
products |
Project
Type |
Primary
Transport Review |
Scale
of Business |
£200m
sales; 12,000 pallets |
|
|
| Key
Task 1 |
Analyse
current operation and establish benchmarks |
Key
Task 2 |
Analyse
options for alternative operation to improve service levels
and security of deliveries
|
Key
Task 3 |
Develop
Tender specification; Identify suitable contractors; Evaluate
3PL responses |
Key
Task 4 |
Develop
recommendations |
| Results
|
On-time
delivery services with minimal product losses; 10% transport
savings
|
Assignment
K512
Sector
|
U.K.
National Retail |
Product
Type(s) |
Office
Equipment & Stationery |
Project
Type |
Strategic
Review of U.K. D.C's. & Transport Network |
Scale
of Business |
£252m
p.a. sales; 160 outlets |
|
|
Key
Task 1 |
Analyse
& advise on strategy for D.C network |
Key
Task 2 |
Create
outline design for New Build additions |
Key
Task 3 |
Re-design
existing D.C. layouts & processes |
Key
Task 4 |
Re
configure Transport Network Schedules |
Results
|
Net
Reduction in Warehousing costs £1.6 m.p.a.
Projected
reduction in annual kilometers 25% |
Assignment
K513
Sector
|
Furnishing
Retail |
Product
Type(s) |
Carpets
|
Project
Type |
Strategic
review of UK Distribution:
Design
N.D.C. & Transport Network
Contract
Mange 3PL implementation |
Scale
of Business |
Sales
£ 387m. Deliveries 60k.Units 700,00k |
|
|
Key
Task 1 |
Identify
Network options and determine optimal solution. |
Key
Task 2 |
Specify
and acquire:
Warehouse/racking
- Outbases
M.H.E.
- Transport fleet |
Key
Task 3 |
Provide
Budgets and Transition/Implementation plans |
Key
Task 4 |
Mange
3PL in the execution of the strategy |
Results
|
38%
reduction in Core Transport mileage.
Improved
store delivery service, both in regularity and frequency |
Assignment
K514
Sector
|
3PL
|
Product
Type(s) |
Transport
and Haulage |
Project
Type |
Customer
contract review |
Scale
of Business |
£3m
contract |
|
|
Key
Task 1 |
Review
profit and loss account and establish level of losses attributable
to customer contract
|
Key
Task 2 |
Analyse
current operations to identify strengths and weaknesses of
the current operation |
Key
Task 3 |
Analyse
transport movements using DPS-Logix transport planning software
to determine what options were available to reduce operating
costs and losses |
Key
Task 4 |
Preparation
and presentation of findings to haulier management and customer
with recommendations on corrective action |
Results
|
Identified
cost cutting improvements which were implemented, but also
recommended withdrawal from 50% of the contract which could
not be improved |
Assignment
K515
Sector
|
3PL
|
Product
Type(s) |
Transport
and Haulage |
Project
Type |
Haulier
profitability review |
Scale
of Business |
£45m
sales |
|
|
Key
Task 1 |
Develop
a model to analyse fleet operations and haulier profitability
|
Key
Task 2 |
Analysis
of profitability by vehicle, route and customer; established
strong and weak performing areas
|
Key
Task 3 |
Make
recommendations on changing operations to address profitability
weaknesses |
Key
Task 4 |
Train
management on use and further development of the model |
Results
|
Identified
cost cutting improvements which were implemented, but also
recommended withdrawal from 50% of the contract which could
not be improved |
Assignment
K516
Sector
|
Retailing
|
Product
Type(s) |
Food
|
Project
Type |
Network
Configuration and Transport Review |
Scale
of Business |
£300m
sales; 80k deliveries; 800k cages |
|
|
Key
Task 1 |
Develop
model of future volumes and activity
|
Key
Task 2 |
Determine
best fit locations for central and regional depots
|
Key
Task 3 |
Design
new cross-dock operations
|
Key
Task 4 |
Model
costs of future network configuration and make recommendations
on strategy |
| |